English中文

Injection Mold Maintenance Plan

Column:Market dynamics Time:2019-04-25
PVC Plastic Tube Core Manufacturer to explain to you the inspection and maintenance of the mold.

PVC Plastic Tube Core Manufacturer to explain to you the inspection and maintenance of the mold.

1. Before the mold is installed, the upper and lower surfaces of the injection mold should be cleaned to ensure the correct fit of the injection mold mounting surface and the press table.

2. After the mold is installed, the mold is opened, the mold guiding mechanism is cleaned, and the surface of the cavity is cleaned to ensure the quality of the workpiece.

3. Lubricate or apply grease to each sliding part of the mold.

Adhesive Tape Cores

4. Inspect and maintain the side guards and clean the punching waste roads and holes.

5. Check safety parts such as mold safety side pins and safety screws, find problems, repair and replace them in time.

Our company specializes in the production of Adhesive Tape Cores, please feel free to contact us.